Innovative construction methods of Osmangazi bridge


ZEYBEK F.

IABSE Symposium 2019 Guimaraes: Towards a Resilient Built Environment - Risk and Asset Management, Guimaraes, Portekiz, 27 - 29 Mart 2019, ss.912-918, (Tam Metin Bildiri) identifier

  • Yayın Türü: Bildiri / Tam Metin Bildiri
  • Doi Numarası: 10.2749/guimaraes.2019.0912
  • Basıldığı Şehir: Guimaraes
  • Basıldığı Ülke: Portekiz
  • Sayfa Sayıları: ss.912-918
  • Anahtar Kelimeler: Fault, North Anatolian Fault, Osmangazi Bridge, Seismic, Span, Technics
  • Isparta Uygulamalı Bilimler Üniversitesi Adresli: Evet

Özet

Construction period of Osmangazi Bridge was around 39 months and a short period for a large multi span bridge in a marine environment. The Osmangazi Bridge is situated in a very active seismic area where in 1999 the 7.6 Kocaeli earthquake occurred on the North Anatolian Fault in 1999. Therefore, the bridge is designed to resist earthquakes. The North Anatolian fault is approximately 1600 km long major right-lateral strike slip fault forming the tectonic boundary between the Eurasian Plate and Anatolian Block of the African plate. Bridge Owner required aesthetic, seismic resistant, durable, economic, maintained bridge and fast track opening to traffic. This paper summarizes the innovative construction technics used during construction of the Osmangazi Bridge that is fourth longest suspension bridge in the World with a main span of 1550 meters.